The eventual goal of the study is to develop a plan for the implementation of a Chittenden County pilot deployment of the Surtrac adaptive traffic signal system after conducting the simulation analysis of the potential performance benefits of its use. The project will examine system performance to future year 2025.
Project lead: Stephen Smith, Pranav Shah
Project member: Greg Barlow, Allen Hawkes
Sponsors: Chittenden County Reginal Planning Commission
Project time period: Jan 2015-Dec 2015